Volume 2

Up Volume 1 Volume 2 Volume 3 Volume 4

Chap 11 Chap 12 Chap 13 Chap 14 Chap 15 Chap 16 Chap 17 Chap 18 Chap 19 Chap 20

Table Of Contents

Chap. 11This chapter coves the examination of SHGb02+14a in a field day setting (2004-11-20), several bug work off tasks, and the development of a OLE server SETI Net Clock server and several clients (2005-01-26).
Chap. 12More work on the software and release of the OLE Clock Server, Spectrum Analyzer and the SML Generator.  Covers the period 2005-01-31 to 2005-03-18.  Addition of counter weights to the antenna, Azimuth limit switch installation, a new line amplifier and the presentation of the schematic of the LNA and filter system.  Also the repair (again) of a jammed rotor.
Chap. 13This chapter marks the start of the Remote SETI Client/Server development.  In it the first prototype is released (2005-03-18 to 2005-03-26)and Dave Ames was the first to use it.  Then I went through a *long* process of trade off's to decide on the architecture to be used in the finished project and yet another rotor failure.
Chap. 14During this period (2005-04-27 to 2005-07-12) I was able to build a prototype streaming audio client and server, tested a radio control client, broke and fixed that antenna rotor and then broke it again.
Chap. 152005-07-12 to 200507-25.  Major problems with the Az motor in the rotor (finding replacement) and work on integrating the audio into the remote client.
Chap. 162005-08-24 to 2005-10-05.  This chapter deals with the completion of a major repair on the antenna rotor (damn tooth), the installation of limit switches, the encoder schematic, Optical encoder schematic and the Red release of the Client/Server software
Chap. 172005-10-04 to 2005-05.  Work on the LNA and a new schematic;  Frequency list of known beacons; Testing of the new Icom R7000 receivers with help from Ed Cole
Chap. 182005-10-11 to 2005-12-31.   A simple distribution amplifier was built to connect both receivers to the antenna; An automatically updated image of the  antenna is captured and supplied to the web site for position monitoring; the R7000 software is developed; The IF down converter is installed in the R7000 receiver
Chap. 192006-01-01 to  2006-06-15.  Start of the new year resolution list, bug in the ICOM R 7100 notch filter, New Kerr modules installed,  Antenna power supply redo, search for new antenna rotor and work on the client/server software.
Chap 202006-06-16 to 2006-08-12.  Recalibration of the antenna Lock-To-Lock logic, addition of counter weights,  Work on the status page (stalled), purchase of a spectrum analyzer and O'Scope, Construction of a audio front end device and Client/Server nears completion.
 Current chapter shown on the Engineering Page.

Home ] Up ] Volume 1 ] [ Volume 2 ] Volume 3 ] Volume 4 ]

Up ] Volume 1 ] [ Volume 2 ] Volume 3 ] Volume 4 ]