| Chap. 11 | This chapter coves the examination of SHGb02+14a in a field day setting (2004-11-20), several bug work off tasks, and the development of a OLE server SETI Net Clock server and several clients (2005-01-26). |
| Chap. 12 | More work on the software and release of the OLE Clock Server, Spectrum Analyzer and the SML Generator. Covers the period 2005-01-31 to 2005-03-18. Addition of counter weights to the antenna, Azimuth limit switch installation, a new line amplifier and the presentation of the schematic of the LNA and filter system. Also the repair (again) of a jammed rotor. |
| Chap. 13 | This chapter marks the start of the Remote SETI Client/Server development. In it the first prototype is released (2005-03-18 to 2005-03-26)and Dave Ames was the first to use it. Then I went through a *long* process of trade off's to decide on the architecture to be used in the finished project and yet another rotor failure. |
| Chap. 14 | During this period (2005-04-27 to 2005-07-12) I was able to build a prototype streaming audio client and server, tested a radio control client, broke and fixed that antenna rotor and then broke it again. |
| Chap. 15 | 2005-07-12 to 200507-25. Major problems with the Az motor in the rotor (finding replacement) and work on integrating the audio into the remote client. |
| Chap. 16 | 2005-08-24 to 2005-10-05. This chapter deals with the completion of a major repair on the antenna rotor (damn tooth), the installation of limit switches, the encoder schematic, Optical encoder schematic and the Red release of the Client/Server software |
| Chap. 17 | 2005-10-04 to 2005-05. Work on the LNA and a new schematic; Frequency list of known beacons; Testing of the new Icom R7000 receivers with help from Ed Cole |
| Chap. 18 | 2005-10-11 to 2005-12-31. A simple distribution amplifier was built to connect both receivers to the antenna; An automatically updated image of the antenna is captured and supplied to the web site for position monitoring; the R7000 software is developed; The IF down converter is installed in the R7000 receiver |
| Chap. 19 | 2006-01-01 to 2006-06-15. Start of the new year resolution list, bug in the ICOM R 7100 notch filter, New Kerr modules installed, Antenna power supply redo, search for new antenna rotor and work on the client/server software. |
| Chap 20 | 2006-06-16 to 2006-08-12. Recalibration of the antenna Lock-To-Lock logic, addition of counter weights, Work on the status page (stalled), purchase of a spectrum analyzer and O'Scope, Construction of a audio front end device and Client/Server nears completion. |