Notebook

Up System Software Hardware Notebook

Volume 1 Volume 2 Volume 3 Volume 4

SETI Engineering Notebook

Summary Of Contents

Volume 1 - Initial installation 1998 to August 2004

  • Antenna and rotor problems

  • Installation of the first receiver

  • Start of the SML language

  • Comb line filter and receiver bandwidth

  • Integration of the Sky Map and beginning of the waterfall presentation

  • An epiphany

  • More rotor repair

  • Database start

  • Yet Another Antenna rebuilt (YARR)

Volume 2 November 2004 to August 2006

  • OLE Server and SETI Net Clock

  • Spectrum analyzer

  • First Remote SETI software build

  • YARR

  • Addition of second receiver with IF down converter

  • Nearing completion of Remote SETI software

Volume 3From September 2006 to January 2008

  • Rebuild of the Spectrum Analyzer and the SML Generator

  • More SML, Raising the antenna

  • First signal that 'could have been' a SETI beacon

  • Stupid astronomer trick (Kitt Peak)

  • Address space calculations (12 million places to visit)

  • SET Net now running full time at full resolution

  • Major rotor repair.  System down four months.

Volume 4 - From January 2008 to October 2008

  • First Light

 

Up ] System ] Software ] Hardware ] [ Notebook ]